Image
Image
Image
  • Nipple Up /
    Nipple Down

  • BOPE Testing

  • Choke Manifold
    Testing

  • Casing & Wellhead
    Testing

  • Nitrogen -
    Accumulator Testing

  • BOPE Stack
    Lift up to 100,000 lbs.

  • Drilling Iron Rental

  • BOP Ram Rental
Image
Image
  • Nipple Up /
    Nipple Down

  • BOPE Testing

  • Choke Manifold
    Testing

  • Casing & Wellhead
    Testing

  • Nitrogen -
    Accumulator Testing

  • BOPE Stack
    Lift up to 100,000 lbs.

  • Drilling Spool Rental

  • BOP Ram Rental
Image
Image
Image
Image
  • Pre Frac & Frac Support
    (24 Hours)

  • Post Frac Casing
    Testing & Maintenance

  • Completion BOPE &
    Snubbing Unit Test

  • 2-way Check valves &
    Back PSI Valves

  • Liner & Frac Sleeve
    Assistance

  • High Volume Units (1 bbl+)

  • Completion Torque

  • Iron Certifications
Image
Image
  • Pre Frac & Frac Support
    (24 Hours)

  • Post Frac Casing
    Testing & Maintenance

  • Completion BOPE &
    Snubbing Unit Test

  • 2-way Check valves &
    Back PSI Valves

  • Liner & Frac Sleeve
    Assistance

  • High Volume Units (1 bbl+)

  • Completion Torque

  • Iron Certifications
Image
FOLLOW US!

ImageImageImageImageImage