- Nipple Up /
Nipple Down
- BOPE Testing
- Choke Manifold
Testing
- Casing & Wellhead
Testing
- Nitrogen -
Accumulator Testing
- BOPE Stack
Lift up to 100,000 lbs.
- Drilling Iron Rental
- BOP Ram Rental
- Nipple Up /
Nipple Down
- BOPE Testing
- Choke Manifold
Testing
- Casing & Wellhead
Testing
- Nitrogen -
Accumulator Testing
- BOPE Stack
Lift up to 100,000 lbs.
- Drilling Spool Rental
- BOP Ram Rental
- Pre Frac & Frac Support
(24 Hours)
- Post Frac Casing
Testing & Maintenance
- Completion BOPE &
Snubbing Unit Test
- 2-way Check valves &
Back PSI Valves
- Liner & Frac Sleeve
Assistance
- High Volume Units (1 bbl+)
- Completion Torque
- Iron Certifications
- Pre Frac & Frac Support
(24 Hours)
- Post Frac Casing
Testing & Maintenance
- Completion BOPE &
Snubbing Unit Test
- 2-way Check valves &
Back PSI Valves
- Liner & Frac Sleeve
Assistance
- High Volume Units (1 bbl+)
- Completion Torque
- Iron Certifications